日韩精品久久久久久久电影蜜臀,特级毛片内射WWW无码,内射精品无码中文字幕,女的被弄到高潮娇喘喷水视频,337P粉嫩日本欧洲亚洲大胆,每日更新在线观看AV,极品熟妇大蝴蝶20P,国产AV无码专区亚洲AV桃花庵,破外女出血视频全过程,丰满的女房东在线观看6

Home > Applications > Food And beverage > Application of Senior electromagnetic flowmeter in Xichang w

Application of Senior electromagnetic flowmeter in Xichang w

Time:2020-10-23 16:21 Source:SINIER

Company Name:

Project:

  Xichang water plant is subordinate to Xichang water group. Xichang water company was founded in 1966 with 315 employees. It consists of Beishan water plant (Xihe pump house), Qionghai water plant (Chengnan booster station), Sanshui water plant, Lizhou water plant and Chuanxing water plant. The daily water supply scale is 115000 tons / day, and the fixed assets are 142 million yuan. Among them, Sanshui water plant is a modern water plant with full automatic control. Its operation function and water quality meet the domestic requirements. In addition, Xichang Xiaomiao 50000 T / D sewage treatment plant and Qionghai 10000 t / D sewage treatment plant are under construction.

  The above photo is the application photo of Sinier electromagnetic flowmeter in Xichang water plant. Xichang water plant is a modern water plant with full automatic process control. All source water treatment, dosing systems and water supply metering are automatic control and visual process metering. In the second stage of water treatment in the plant area, the source water and water supply of the water plant are measured and monitored by flow meters to realize the automation of data collection, analysis and management. All flow meters on the dosing system of the dosing workshop (PAC) are controlled by the central control room. The flow meter is installed on the dosing pipeline before the dosing point. There are monitoring points in the pressure stabilization well, the dosing room and the central control room for flow measurement, and there are alarm prompts in case of any abnormality. The failure rate of the whole set of equipment is reduced greatly, the maintenance amount is reduced, the stable operation of the dosing system is optimized, and the energy-saving effect is remarkable. All flow meters installed in the plant area are connected with the company's dispatching system. The measurement data of water supply and source water are collected and transmitted by computer. In the dispatching room of the water plant, you can see the operation of all flow meters in the plant area, read the instantaneous flow and cumulative flow parameters of each flow meter, which is convenient for the management of the water plant and greatly improves the authenticity of measurement and detection data It has laid a solid foundation for the scientific and standardized measurement and testing of water plant.